Skip to content
/HALSTEADBuild Co. Start a project

A design-build shop for houses on the Maine coast.

We draw, price and build whole-house renovations, coastal new construction, and restoration work on Portland's 1890–1925 housing stock. Fourteen people. Our own carpentry crew. Three jobs a year.

Portland, Maine Est. 2009 14 on staff Projects $400k–$2.4M Typical build 8–14 months
A completed shingle-style coastal house on a granite ledge above the water in Cape Elizabeth, Maine.
Ledgeward — Cape Elizabeth New build · 4,100 sq ft · 2024 · 13 months on site

Why Halstead

One crew, one schedule, and a number we hold ourselves to.

Most of what goes wrong on a build goes wrong in the handoffs — architect to builder, builder to sub, sub to the next sub. We removed most of those. Drawings, budget, framing, trim and millwork all happen under one roof, and one project manager owns your job start to finish.

See how a Halstead build actually runs

01

Drawn and priced here

Schematics, the permit set and a line-item budget before a shovel moves. You get the same spreadsheet we work from.

02

Nine carpenters on payroll

Framing, exterior trim, stairs and built-ins are ours. We sub mechanicals, and only to the four shops we've used for a decade.

03

Old houses, honestly

Balloon framing, knob-and-tube, horsehair plaster, a sill gone soft under the bay. We price the ugly before we open the wall.

04

One PM, one phone number

Dana Chirico carries three jobs at a time, never four. Weekly walk-through, a Friday photo log, and a schedule that gets updated, not defended.

Before & after

Deering Street, the dining room.

A 1905 Queen Anne with a dropped acoustic ceiling, four layers of wallpaper and carpet glued to quartersawn oak. Fourteen months. Drag the handle — or use the arrow keys.

The Deering Street dining room after restoration: plaster walls, refinished oak floor, restored mantel.
The same dining room before work: peeling wallpaper, a dropped acoustic ceiling and worn carpet.
Before · Sept 2022 After · Nov 2023

Deering St · Portland · 4,400 sq ft · full restoration

Plaster: Casco Bay Plastering · Floors: original 1905 oak, re-laid

The build

Six phases. Nobody disappears in the middle of one.

Every Halstead job runs the same six phases with the same paperwork at the same points, whether it's a bath or a whole house.

Full phase-by-phase breakdown

01

2–3 weeks

Site visit & feasibility

We walk the house, open a closet floor if you'll let us, and tell you whether the number in your head is the right one.

02

6–10 weeks

Design & drawings

Schematics through permit set, in-house or alongside your architect. Two rounds of revisions built into the fee.

03

3–5 weeks

Pricing & contract

Line-item budget from real subcontractor bids — not square-foot guesswork. Allowances written in plain English.

04

4–9 months

Build

Demo, structure, dry-in, mechanicals, insulation, plaster. Weekly walk-through, Friday photo log, monthly draw.

05

6–12 weeks

Finish & millwork

Trim, stairs, cabinetry from our shop, tile, paint. The slowest-looking phase and the one people remember.

06

2 weeks + 1 year

Punch & warranty

Walk-through list closed in fourteen days, then a one-year callback where we come fix the drywall cracks winter puts in.

The Halstead crew setting a wall on a jobsite, seen from a distance.
2009 Two carpenters, one van,
a shop on Presumpscot St

The shop

“I spent nine years restoring houses on Munjoy Hill for someone else, and the thing that got me was how little anyone told the owner. So we built a company where the schedule is on the wall and the budget is a shared document.”

Ellis started Halstead in 2009 with one other carpenter and a 900 sq ft shop. Fourteen people now: nine carpenters, two project managers, a designer, an estimator, and Ruth in the office who has answered the phone since the second year.

Straight answers

We are booking eleven months out, and we price cost-plus.

Two things people ask on the first call, so here they are up front. Our next whole-house start is August 2026; kitchen and bath work usually opens up sooner. We work cost-plus with a fixed fee — you see every invoice from every sub, and our fee doesn't grow when the job does.

Design and pricing runs $9k–$28k depending on scope, and it credits against the build if you go ahead with us.

147Houses since 2009
92%Finished within 5% of contract
9Carpenters on payroll
1yrCallback warranty, in writing

Tell us about the house.

Send us the address, roughly what you're thinking, and what you'd like to spend. Ellis or Dana calls back within two business days — a real call, not a form letter.

developed by simple flow